Submissions
1 min read
APA Submission AEMO Draft 2026 Integrated System Plan
Published on
13 February 2026
Share this post

Our submission to the draft Integrated System Plan highlighted the important role of gas powered generation in maintaining the reliability and security of the electricity system. In our view, the 2026 draft ISP underforecasts the need for near-term GPG.

APA Submission AEMO Draft 2026 Integrated System Plan