Badgingarra Solar Farm

The Badgingarra Solar Farm (BSF) is adjacent to APA’s Emu Downs Wind Farm, across 40 hectares of land on the corner of Bibby Road and Yerramullah Road. This development is co-located with the Badgingarra Wind Farm.

BSF will consist of almost 62,000 panels, utilising a NEXTracker single axis tracker system and providing a total output of 19 megawatts to the Western Power grid.

The potential output of BSF is the equivalent power required for more than 6,000 Western Australian homes, and will have the ability to save 32,900 tonnes of greenhouse emissions annually.

The construction of BSF began in early August 2018 and commenced commissioning in August 2019.

Badgingarra Solar Farm is part of APA's Western Australian Energy Precinct.