murraylink
Murraylink delivers electricity between the South Australian and Victorian regions of the National Electricity Market (NEM). Murraylink consists of a single high voltage direct current transmission line, approximately 176 kilometres long, with converter stations at Red Cliffs, Victoria and Berri, South Australia. Murraylink has capacity to deliver 220 megawatts of power into the AC network in either state.
Description |
Murraylink is a single DC link 220 megawatt of capacity which extends 176 kilometres from Red Cliffs in Victoria to Berri in South Australia. |
---|---|
Regulator |
Australian Energy Regulator (AER) |
Regulatory status |
Regulated under the National Electricity Law and National Electricity Rules. |
Required Documentation |
Further information is available on the AER website. |
2023-28 Transmission Determination Proposal |
|
Obsolete IGBTs |
|
Contacts |
BYDA - Home | Before You Dig Australia (BYDA) ESV - Look up and live | Energy Safe Victoria (esv.vic.gov.au) |