Keralup Energy Hub

The Keralup Energy Hub (KEH) is a proposed energy project that will combine gas-powered generation with large-scale battery storage.

2026
Early planning
210MW
Temporary gas-powered generation
Up to 870MW
Gas-powered generation
Up to 2,400MWh
BESS
Frequently asked questions - environment

Learn how the Keralup Energy Hub has been designed to minimise impacts on the local environment and protect native vegetation, wetlands, and wildlife. Please note: We will continue to update this section as environmental assessments and project planning progress.

How much native vegetation would the Keralup Energy Hub clear?

Keralup Energy Hub has been designed to minimise impacts on the local environment. The project is planned within a 452-hectare total project envelope across a much larger 1,300-hectare site. Of the total project envelope, only 2.6% is ‘remnant vegetation’ – that is, areas of native plant life not previously impacted by land clearing or development.

 

The total potential ground disturbance is 281 hectares, with 56% of this area rated as “degraded” or “completely degraded”, the lowest tiers of the standard vegetation condition scale.

 

Of the 281 hectares of ground disturbance, 9.51 hectares is already cleared and 91.4 hectares is scattered remains from a Blue Gum Plantation with native vegetation regrowth in the understory. The remainder (159 hectares) of native vegetation is largely natural regeneration following historic clearing of the property for farming and plantations.

 

The design will protect existing wetlands and ecological communities on the site and APA has assessed no significant residual impact on flora. It is important to remember the site has been identified for industrial development for decades.

How will Carnaby's black cockatoos and other wildlife be protected?

The layout avoids jarrah and marri woodland where black cockatoos feed. Less than 0.1 hectares (1,000 square metres or the size of a generous suburban block of land) may need pruning or individual trees removed to keep power lines clear.

 

APA assessment of the site found no night roosting of black cockatoos, the trees that may be pruned or removed are unsuitable for nesting. Separately, up to seven hectares of habitat used by Quenda would be cleared, representing 0.08% of suitable habitat within 10 kilometres.

 

APA has assessed no significant residual impact on fauna. Clearing will follow APA's vegetation and fauna protocol, with exclusion zones and specialists on site. 

Why clear vegetation for a temporary power station?

If required, the temporary power supply would use up to 15 hectares and run for about three to five years while the permanent power station is built. This area would then be reused for parking, equipment storage and maintenance laydown. The vegetation is largely natural Kunzea regeneration following historic clearing of the property for farming and plantations and is in degraded condition. This would also be rehabilitated when the permanent station is decommissioned. 

Why build energy infrastructure at the site? What about housing?

The site and surrounding areas have been assessed as unsuitable for residential development, with the State Government abandoning these plans in 2015. The area was deemed unsuitable due to a range of factors, including the risk of mosquito-borne disease, and the fill requirements associated with broad-scale housing. These constraints are materially different for the Keralup Energy Hub, which has a much smaller, targeted footprint, allowing infrastructure to be located in more suitable areas requiring less fill. The proposal also does not introduce a permanent residential population, with mosquito exposure for workers is able to be managed through standard workplace controls. This makes the site well suited to the proposed industrial use, despite the constraints for residential development.

Is the Keralup Energy Hub linked to other proposals nearby?

The Keralup Energy Hub is a standalone APA proposal. While the site has the capacity to integrate digital infrastructure, other industrial facilities and renewable energy generation infrastructure, no proposals for this potential future infrastructure have been submitted. Other developments nearby include the Peel Agri-Bio Innovation Precinct on neighbouring Lot 9503, about 2.5 kilometres from the hub.

Frequently asked questions - project

Explore key details about the proposed Keralup Energy Hub, including APA’s ownership, staged infrastructure components, and how the project is designed to supply future industrial energy needs. Please note: We will continue to update these answers as project planning develops.

Who owns the Keralup Energy Hub?

APA KPS Pty Ltd (a 100% subsidiary of APA Group) would own, build and operate the Keralup Energy Hub. APA is an Australian energy infrastructure business listed on the Australian Securities Exchange (ASX). APA has a long history as an energy infrastructure partner across Western Australia, with 380 employees across WA supporting the operation of wind, solar, batteries, gas-powered generation and gas transmission and storage assets. This includes assets critical to Western Australia’s energy security, including the Mondarra Gas Storage and Processing Facility north of Perth, major gas transmission pipelines, including the Parmelia Gas Pipeline and Goldfields Gas Pipeline, and the Badgingarra and Emu Downs Wind and solar farms.

Who will use the power? Is there a customer in place?

No customer agreements have been signed. The hub is designed to supply future industrial customers, including a potential data centre, and could support the reliability of the SWIS. Any future industrial facility at Keralup would need its own development approvals and community consultation. APA is progressing planning and approvals now so the site is ready when future industry needs power.

How big is the Keralup Energy Hub?

The size of the Keralup Energy Hub and timing of any development will depend on customer requirements.

 

The referred project proposes a temporary power supply of up to 210 MW, a permanent power station of up to 660 MW and a battery energy storage system of up to 2,400 MWh. There is potential to integrate onsite renewables generation in the future. This infrastructure would be delivered in stages to minimise impacts and align with customer requirements.

 

The 870 MW figure is the two gas components combined.

 

Component Maximum size Temporary or permanent
Temporary gas-fuelled power supply Up to 210 MW Temporary
Permanent gas-fired power station Up to 660 MW installed; about 520 MW expected operating load Permanent (about 40 years)
Battery energy storage system Up to 2,400 MWh, built in stages Permanent
Gas supply Up to 150 TJ a day Permanent
Frequently asked questions - approvals and opportunities for community feedback

Find out more about the environmental assessment process, regulatory approvals, and upcoming opportunities for landholders and the local community to share feedback. Please note: We will continue to update this section as community consultation and the assessment process progress.

Why is the community only hearing about this now?

The Keralup Energy Hub is in the very early stages of development. So far, APA has spoken to the City of Rockingham, the Shire of Murray, the Gnaala Karla Booja Aboriginal Corporation, the EPA, Western Power, Water Corporation, the Peel Development Commission and other state agencies. APA wrote to neighbouring landholders in July and August about site assessment works and how to register for updates and has since commenced engagement with these neighbouring landholders about the project.

 

APA has only recently submitted a Part IV referral to the Western Australia Environmental Protection Authority. Community consultation will continue and be considered in the refinement of the project planning. Referring the project to the EPA now means landholders can review the proposal and comment before any decisions are made.

 

APA will hold information sessions in the coming months and will be engaging directly with residents and landholders close to the proposed project. 

What approvals does the Keralup Energy Hub need? Why such a short timeframe for feedback?

APA has referred the Keralup Energy Hub to the EPA for assessment under section 38 of the Environmental Protection Act 1986 (EP Act).
The initial seven-day public comment period on APA’s referral, ending 1 November 2026, will inform the EPA’s decision on further assessment required.

 

Following this period, the EPA will make its decision on whether to assess the proposal, and APA expects that a formal environmental impact assessment will follow and will include a comprehensive review.
The WA EPA will determine the scope and process required for the assessment, including appropriate further public participation.

 

APA is committed to a transparent and comprehensive assessment process and is committed to engaging closely with the local community and broader stakeholders. 

Keralup Energy Hub (KEH)